CASE STUDY TYPE:

 

Design Management

PROJECT TYPE:

 

Major Structural Refurbishment / Enhancement

(St James Square, London)

 

CLIENT:

 

Confidential

 

 

VALUE:

 

circa £10m

 

 

FORM OF CONTRACT:

 

JCT Traditional with extensive CDP

 

 

SERVICES PERFORMED:

 

Design Management function during the Delivery phase

 

__

 

 

BENEFITS TO CLIENT:

 

 

  • Robust design management process introduced for certain high-risk packages, during the delivery period. Greater benefit could have been realised, had we been engaged during the tender period. 
     

  • Alignment of the specialist contractor packages with the Requirements, ensuring appropriate / robust packages award and Contractor design. 
     

  • BONDS representative established himself as the key point of contact for the design team. Facilitating design workshops with the key specialist Contractors, to bring efficiency to the design and approvals process. 
     

  • Bringing clarity on the deliverables from both the Consultant team and CDP Contractors.

 

 

Anchor 1
Anchor 2

PROJECT TYPE:

 

Residential Development

(North London)

 

CLIENT:

 

Confidential

 

 

VALUE:

 

circa £15m

 

 

FORM OF CONTRACT:

 

JCT Design & Build

 

 

SERVICES PERFORMED:

 

Design Management function during the Delivery phase

 

__

 

 

BENEFITS TO CLIENT:

 

 

  • Robust design management process introduced for certain high-risk packages, during the delivery period. Greater benefit could have been realised, had we been engaged during the tender period. 
     

  • Alignment of the specialist contractor packages with the Requirements, ensuring appropriate / robust packages award and Contractor design. 
     

  • BONDS representative established himself as the key point of contact for the design team. Facilitating design workshops with the key specialist Contractors, to bring efficiency to the design and approvals process. 
     

  • Bringing clarity on the deliverables from both the Consultant team and CDP Contractors.

 

 

Anchor 3

PROJECT TYPE:

 

Commercial Refurbishment (Central London)

 

CLIENT:

 

Confidential

 

 

VALUE:

 

£20m+

 

 

FORM OF CONTRACT:

 

JCT Design & Build

 

 

SERVICES PERFORMED:

 

Design Management during the Pre-construction phase, through to project Delivery

 

__

 

 

BENEFITS TO CLIENT:

 

 

  • Robust design management process during the initial tender period, proved influential in the main contractor securing this prestigious project.
     

  • Comprehensive Contractors Proposals brought clarity to the Main Contractors offer, whilst safeguarding their position during the delivery phase.
     

  • BONDS representative established himself as the key point of contact for the client team, the go to manager with consideration for the client requirements and concerns. A role that is all too often overlooked on current projects, resulting in frustration and friction on the client’s side. 
     

  • As the project advances, the team find themselves in the fortunate position, whereby the contractor and his supporting specialists have clarity on their deliverables.

 

 

Anchor 4

PROJECT TYPE:

 

Commercial Refurbishment (Central London)

 

CLIENT:

 

Confidential

 

 

VALUE:

 

circa £5m

 

 

FORM OF CONTRACT:

 

JCT Design & Build

 

 

SERVICES PERFORMED:

 

Design Management function
during the Delivery phase

 

__

 

 

BENEFITS TO CLIENT:

 

 

  • Robust design management process introduced after the tender period.
     

  • Alignment of the specialist contractor packages, ensuring appropriate / robust packages award.
     

  • BONDS representative established himself as the key point of contact for the design team. A role that is all too often overlooked on current projects, resulting in frustration and often inappropriate construction on site.
     

  • Clarity on the deliverables from both the Consultant team and CDP Contractors.

 

 

PROJECT TYPE:

 

Residential Development

(North London)

 

CLIENT:

 

Confidential

 

 

VALUE:

 

circa £15m

 

 

FORM OF CONTRACT:

 

JCT Design & Build

 

 

SERVICES PERFORMED:

 

Design Management function during the Delivery phase

 

__

 

 

BENEFITS TO CLIENT:

 

 

  • Robust design management process introduced for certain high-risk packages, during the delivery period. Greater benefit could have been realised, had we been engaged during the tender period. 
     

  • Alignment of the specialist contractor packages with the Requirements, ensuring appropriate / robust packages award and Contractor design. 
     

  • BONDS representative established himself as the key point of contact for the design team. Facilitating design workshops with the key specialist Contractors, to bring efficiency to the design and approvals process. 
     

  • Bringing clarity on the deliverables from both the Consultant team and CDP Contractors.

 

 